Residential Skylights

The Skylight Installation Process


Installations typically take between 2-5 days depending on a variety of factors including the size and complexity of the skylight and the objects in the attic that are in the path of the skylight design.

Marking out the skylight


1.  The first step in the process is to determine the design and placement of the skylight. Once there is a plan for the skylight it must be marked out in the room and on the roof.


Protect Work Area


2.  The second step is to setup for the install. This begins with establishing a protected path to and from the skylight as well as containing the dust the debris using plastic and drop clothes.



Cut the whole 3.  Next the skylight must be positioned on the roof and the whole cut out where it will be placed. Carefull consideration of the roof joists must be taken into account during this step so as to maintain the structural integrety of the roof. It should be noted here that a well installed skylight well actually make a roof stronger and more stable.


Previous Page   1   2   3   4   5   6   Next Page